tender for fire control project of 7 buildings in xinjinyang factory area -凯发k8旗舰厅

issuing time:2018-11-20 15:47

now zhangjiagang xinjinyang high-tech fiber material co., ltd. has completed the construction of 7 monomer buildings in the factory area, which needs to conduct fire control acceptance inspection. therefore, it openly invites tenders to fire control engineering companies that are qualified to provide fire control acceptance inspection reports to assist enterprises to complete fire control acceptance inspection. our company will be in line with the principle of open competition, choose high-quality service, reasonable price of the company, the content of the tender is published as follows, welcome the relevant companies to bid.

one, according to the zhangjiagang issued by public security fire brigade to the company's "the construction of fire control design for the record review opinion" and "the construction of fire control design for the record inspection qualified opinion", the company has 7 building monomer according to the opinions of the fire, along with the construction process has to do fire protection construction, now need to fire fill a vacancy, correct non-standard parts, and make information for the record, and make it meet fire acceptance standard

ii. the successful fire engineering company has passed the acceptance inspection of the target (fire engineering of 7 single buildings).

3. the contractor shall pay for the construction expenses and the builder shall purchase the materials.

in addition: please attach the company's qualification certificate.

the workshop

building height

area (㎡)

workshop a (ground floor)

11 meter

11992

workshop 1 b (floor 2)

11 meters

11974

workshop 4 (local second floor on the ground floor)

6 meters

3038

workshop 2 (ground floor)

11 meters

5113

workshop 3 (local second floor on the ground floor)

11 meters

8943

110 substation (2 floors above ground)

16.5 meters

1686.98

thermal media station (one of the three floors above ground)

18.2 meters

3596

a combined

46342.98